Delivery and assembly of the approx. 5,200 ton steel structure as part of the construction work on the tram and tram bridge in Kraków, including access roads.
Technical data: supporting structure – steel construction, with four girders and orthotropic plate, a bridge field with a length of L = 166m, support body made of reinforced concrete, foundation on piles d = 1500 mm, length: 166 m, width: 37 m. This is the bridge with the longest freely supported steel bridge span in Poland.
Approaches: Overpasses: north overpass with a length of L = 42 m and south overpass with a length of L = 2 x 42 = 84m.
Client: Budimex S.A.
Completion date: December 2001